Atlants Architecture Studio’s working system is mainly based upon BIM.
Abbreviated from Building Information Modelling, BIM means modeling a building’s information. Using BIM technology, a precise virtual model from building – including architectural, structural, electrical and mechanical drawings and its physical and functional characteristics – is digitalized and stimulated. In tradition common methods, the information were separately calculated, prepared and provided by specialized groups in meetings held. Lack of coordination between outputs provided by different specialized groups, human power mistakes, information faults and rehabilitations were some of the main problems of traditional methods and they resulted in increasing the costs as well as decreasing the quality and wasting time and energy. In Atlant group. Such information in 2D maps are converted into 3d models with all details provided and thereof all the specific properties including the activities and the different role of the building management is defined and stimulated. The next level is to adaption of the modeled information in order to correct or modify the probable Design and execution errors and interference by specialized groups. Also, Estimation of project costs is possible is this model, through saving the important data of all important processes of construction and implementation including Material specifications (weight, volume, length, height, color, size, fire resistance, etc.), component price information, project costs as well as timetable and planning for the project implementation. Here the model is categorized into operational activities, timetable and the costs analysis: here so the modeled project is stimulated in costly and timely aspects s well; therefore this level is a geometric, temporal and financial model that can provide all the information needed to start the project implementation phase. Atlant Architecture group prepares the project scheduled and provides a low size file to the employer or the advisor, in order to be more comprehendible and also the building path and detail be easily understandable in more details. According to the aforementioned processes, modeling the project information makes it possible to simulate possible changes during the project operation period with high accuracy and also to prevent possible interferences in the project implementation process it makes the necessary synchronizations. Thus, operational errors leading to architectural changes are minimized, and the result of this information integration is increased coordination, reduced errors and waste, rework, reduced cost, and ultimately increased quality of work.
|
|